Below you find a short selection of our projects.
Please contact us for the complete list and customer references.
20,000 PSI BOP RE-CERTIFICATION AND JACK-UP RETROFIT
2015 - 2016

- Re-certification of 20,000 psi BOP
- Development of interfaces with designated jack-up
- Gap analysis against regulatory and Company requirements
- Upgrade of jack-up for 20,000 psi operation
DRILLSHIP BOP MUX CONTROL SYSTEM UPGRADE
2014 - 2015

- Technical specifications for system upgrade
- Definition of scope of supply for control components
- Management of software upgrades
- Supervision of shop integration and commissioning
SSDR X-TREE HANDLING AND WOCS UPGRADE
2013 - 2014

- Re-arrangement of surface equipment layout
- Engineering follow-up with manufacturers and Company
- On-site coordination and supervision of installation contractors
- Yard support for installation and commissioning
SSDR WATER DEPTH CAPABILITY UPGRADE
2011 - 2012

- Analysis of subsea equipment re-configuration options
- Technical specifications of subsea packages
- Re-arrangement of surface equipment layout
- Engineering follow-up of manufacturers
- Yard support for installation and commissioning
SSDR CONSTRUCTION AND UPGRADES
2008 - 2011

- Technical specifications of subsea packages.
- Engineering follow-up of manufacturers
- Supervision of critical shop testing
- Yard support for installation and commissioning
- Preparation of commissioning and operating procedures
- Integration of MPD system
- Extended support during operations
DRILLSHIP CONSTRUCTION
2008 - 2010

- Technical specifications of subsea packages
- Engineering follow-up of manufacturers
- Supervision of critical shop testing
- Yard support for installation and commissioning
- Preparation of commissioning and operating procedures
- Interfacing and integration of Company supplied UDF